Collaboration: Act as the primary technical quality interface between Project Quality, Global Sourcing, CTO & Engineering, and the Supplier base.
Operational Excellence: Accountable for the execution of the surveillance plan and early detection of potential non conformities for on-going Purchase Orders. The work can be executed by third parties if trained and qualified by the Supply Quality Commodity Specialist
Root Cause Analysis (RCA): Ability to perform rigorous investigative techniques (like 8D or Ishikawa diagrams) when a defect occurs in a high-voltage component.
Required Qualifications
Bachelor’s degree in Engineering or related technical field.
Proven experience in quality management, supplier development, or manufacturing engineering for the defined commodity (Power Transformers and Bushings).
Strong analytical skills, competent in problem solving with the ability to interpret NC data and define root cause corrective actions.
Familiarity with ISO 9001 standards and quality audit processes and other relevant international standards.
Excellent communication skills; ability to influence cross-functional teams and external stakeholders.
Willingness to travel globally to supplier manufacturing locations as required by the Surveillance Plan.
Technical Competencies
Candidates must possess deep technical expertise relevant to the specific commodity. Please specify the required background below:
Insulation System & Oil Chemistry: Expert knowledge of cellulose aging, DGA (Dissolved Gas Analysis) trends, and moisture management.
Core & Winding Fabrication: Understanding of interleaving techniques, clamping pressures, and short-circuit withstand capabilities.
Testing Rigor: Proficiency inall electrical and mechanical testing, heat run tests, and low-voltage impulse testing.
Welding: knowledge of welding processes and capable to verify weld logs, define/drive the relevant requirements.
Dielectric Materials: Knowledge of Resin Impregnated Paper (RIP) or Resin Impregnated Synthetic (RIS), Oil Inpragnated Process/SF6 technologies.
Sealing Systems: Ability to oversee assembly of condenser cores, flange interfaces and terminal connections to prevent moisture ingress.
Partial Discharge (PD) Testing: Capacity to interpret PD sensitivity and site/factory acceptance test criteria.
Additional Information
Relocation Assistance Provided: No