Preparation of Project Design Validation in Plan and implementing the same in execution with due approval of the overall design authority
Setup of MOC tool to capture the changes during execution phase
Internal engineering coordination
Ensure Project Design Basis and GDSR compliance list is followed
Site information / site datasheet is aligned with all stakeholders and finalized
Follow-up engineering progress and manage deviation with support of scheduler & project manager
Organize/attend/support project design review Meeting, follow up MOM status, meeting action follow up and close out.
Follow up the changes on P&IDs after freeze review (before freeze review, PID/System Engineer is in charge of follow-up).
Ensure implementation of Governance Check and capture the technical HOLDs in Engineering , HOLDs register
Ensure capturing the changes during execution phase in MOC tool
Follow up any change (engineering / customer / vendor) and propose resolution of solution with related lead engineer/DA and make sure the change is closed properly
Participate in Hazop meeting and close the action points with the help of Engineering disciplines
Provide technical support to PM for external change orders
Coordinating with discipline Leads , Design Authorities and Overall Design Authority for timely closure of the PDVP
Coordinating for As Built documentation
Prepare engineering close out and associated actions list
Technical interface with customer
Organize, conduct necessary technical review meeting with customer
As the interface with the customer, leading the technical clarification with the customer, track all technical requirements and questions between E&C and customer.
Make sure the technical input/output documents exchanges between E&C & customers follows contract requirements
Tracking of client deliverable status and reporting to the management
Obtain the necessary inputs from clients required for engineering completion in a timely manner
Engineering outsourcing Coordination
Coordinate internally with respective disciplines in order to certify the work completion against invoices raised by the engineering subcontractor
Organizing Kickoff meeting with engineering subcontractor and Air Liquide discipline leads